2019 Build Season Week 5
Highlights of the week:
-
We almost finished wiring our pneumatics system. The compressor, pressure relief valve, pressure switch, stored pressure gauge, and 6 solenoid manifold are all mounted.
-
Silvan helped us test the cargo intake system. We diagnosed leaks and the control code.
-
Four air tanks will be mounted using 3D printed mounts.
-
With the help of Edmond, a returning programming mentor, we finally got OpenCV up and running on the Jetson.
-
We tested powering the Jetson through the VRM
Upcoming:
-
Clean up wiring and tubing
-
Continue testing mechanisms as the mechanical team assembles them on the robot
-
Test communications between the RoboRio and the Jetson
-
Work on implementing auto aligning algorithms based on image recognition